PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued installing sprinkler branches at the 1st floor Facing North.jpg Continued roughing bathroom 133 and 136 Facing West.jpg Duct work delivery at the 3rd floor Facing South.jpg Installing ductwork at the 2nd floor Facing South.jpg Installing ductwork fittings at the 1st floor Facing North.jpg Started constructing the equipment rack for the Electrical panels Facing East.jpg Started installing temporary protection around the 1st floor Facing South.jpg Welding clips along Column H-1 Facing South.jpg
Previous pageNext page Installing ductwork at the 2nd floor Facing South
Installing ductwork at the 2nd floor Facing South